Product Detail :
|
Palakkad division-den/ west portion improvements to platform fencing with rcc pale fencing at various stations. bakel fort-proposed development of bakel fort railways stations. palakkad division-provision of rcc crash barriers in road over bridges. pgt-centralized welder's training centre for engg. dept. model room for trd & electronic interlocking & other training equipment for s&t dept. near mdtc pgt. 2) pgt division-provision of rain water harvesting system at mddti.3) pgt-alteration to the office building of sse/tele/lines/pgt. palakkad-improvements to railway playground. shoranur-calicut. calicut-kannur and kannur-mangalore section (bg) trr (p) 48.875 km with new 60kg 90 uts rails at various locations on up & dn line. palakkad division-provision of escalators 2 nos. at mangalore station (civil cost). assistant divisional engineer/palakkad and shoranur section-casual renewal of broken/damaged psc sleepers (ordinary sleepers 3200 nos. psc sleepers for switch portion 4 sets cms crossing portion) 1 in 12.31 sets, 1 in 8.5-3 sets and 1 in 16-1 set. provision of track machine siding facilities & provision for mega ballast depot with 40 bobyn capacity at pollachi station. palakkad division-construction of dress changing room for railway protection force women staff with toilet facilities in existing all railway protection force post. hiring of tata sumo/tavera (non a/c) for the official use of divisional engineer/bridges/palghat for a period of two years. calicut-mangalore section-flash butt welding of 60/52 kg rails using mobile flash butt welding plant at various locations under block (total length 24.700 km). calicut-mangalore section-flash butt welding of 60/52 kg rails using mobile flash butt welding plant at various locations under block (total length 26.757 km).
|