Product Detail :
|
Provision of lifts 2 nos. at quilandi station. * kannur - mangalore section (bg) - complete track renewal (p) 24.938 km with new 60 kg 90 uts rails as lwr on psc sleeper 1660 nos km with elastic fastenings at various locations on up & downline (22.490 km) by sqrs and 2.448 km by manual laying). * mannanur - increasing csl for road no. 182 with provision of sand hump. (work includes extension of road no.182 for a length of 40 mtrs. each provision of over run line at road no. 1 and extension of bridge no.736). * doubling of track between mangalore jn. - panambur - proposed maintenance of newly commissioned track and connected works between kulasekara-jokkata stations. * hiring of tata sumo / tavera (non a/c) for the official use of assistant engineer/ctr for a period of two years (600 days). * calicut - kannur and kannur - mangalore section (bg) through tumout renewal (cmsc+cs) - 95 sets. (through rail renewal of points & crossings 1 in 16-2 sets, 1 in 12-72 sets, 1 in 8.5.17 sets & traps 4 sets) & through turnout renewal (fs.cs+cmsc) 1 set in quilandi (point no. 101 existing 52 kg 1 in 8.5 with new 60 kg 1 in 8.5).
|